For most small contractors, SAM.gov is a once-a-year task. Renew the registration, update the representations, and get back to work. One recent change is worth more than a yearly glance.
Your responsibility record just changed its address. Since November 17, 2026, the government has been building contractor integrity records in SAM.gov rather than in CPARS.gov. If your company wins on trust as much as on technical strength, that moves where your record sits and widens who can view it.
This guide covers what the SAM.gov integrity records change actually does, how the record is built under the revised FAR text, and the moves worth making before you bid again.
What Changed on November 17
An integrity record holds the conduct and performance details a contracting officer weighs before deciding to award. In plain terms, it is your responsibility to file.
The shift is confirmed in an official notice on acquisition.gov. To line up with a change effective November 17, 2026, the FAR Council revised the model deviation text on integrity records in FAR Part 9 and subpart 42.11. Government users now build these records in SAM.gov and no longer create them in CPARS.gov.
Keep one thing straight. Your past performance reviews still sit in CPARS.gov. Only the integrity records have moved so far, and the System for Award Management (SAM.gov) says more CPARS functions may follow later.
A word on scope. The law firm PilieroMazza flagged this in its November 19 weekly update under a heading that also mentioned Part 52. The official acquisition.gov notice lists only Part 9 and subpart 42.11. Go with that as the authoritative scope, and ask your contracting officer how a given agency is applying it.
How the Integrity Record Works Under Part 9
Under the revised Part 9 text (section 9.105-2), an integrity record comes in two segments. The split matters for both your privacy and your reputation.
The first segment is a non-public SAM.gov Workspace. Government officials and the contractor post information into it. The only people who can read it are government personnel or a contractor looking at the data itself.
The second segment is the public responsibility and qualification (R/Q) section of SAM.gov. Anyone can see this one.
Now, the part that catches people out. Information in the Workspace moves to the public R/Q section on its own after a 14-calendar-day waiting period. Three categories stay out of that public transfer:
- Past performance reviews are required by Part 42.
- Information entered before April 15, 2011.
- Information the posting official pulls back during the 14-day window.
You also get a narrow window to shield sensitive material. Assert within 7 calendar days that the posted information falls under a Freedom of Information Act (FOIA) exemption, and the official who posted it has to remove it from the Workspace within 7 calendar days while the question gets sorted out.
What Contracting Officers Must Do Before Award
None of this is just filing mechanics. It runs straight into award decisions, and the FAR language is exact.
Before awarding a contract above the simplified acquisition threshold, the FAR dollar ceiling for streamlined buys, the contracting officer has to review your R/Q records in SAM.gov. Section 9.104-6 now makes that a required step. The officer also factors in your CPARS.gov past performance as part of the wider responsibility call.
Two rules sit inside Part 9 and pull in opposite directions. Both land on small businesses.
The officer is directed to presume a contractor nonresponsible if it is, or recently has been, deficient in contract performance. That presumption falls away only if the problem was beyond your control or you took corrective action. A documented fix, then, is your best defense.
The text also says the opposite guardrail applies. An officer cannot judge you responsible or irresponsible based solely on a lack of relevant performance history. That shields newer firms. A short track record by itself is not grounds to pass you over.
When an officer does rule a contractor above the threshold nonresponsible on performance or integrity grounds, and the Small Business Administration issues no Certificate of Competency, that determination has to be documented in the SAM.gov Workspace within three working days.
Why Primes Must Watch Their Subcontractors
Here is a detail that slips past many teams and raises the stakes for anyone leading one. A subcontractor’s information can show up on the prime contractor’s record.
The FAR text uses trafficking in persons violations as an example. The contracting officer posts that subcontractor information to the prime’s record. So in practice, a sub’s problem becomes visible on your file.
You still have a move to make. The prime can post mitigating factors in SAM Workspace, and the contracting officer is told to consider them. A tight subcontractor management process is now part of guarding your own responsibility record.
A Related Update for Past Performance Writers
As integrity records were shifting, the FAR Council also put out Version 3.0 of the FAR Companion on October 30, 2026. The Companion is advisory guidance rather than a binding rule, so use it as a reference, not a checklist you must satisfy.
Version 3.0 adds material on contract administration and performance management. Its change log and sections reach into areas like contractor self-assessment and reprocurement to the next highest-rated offeror. If your past performance volumes rely on commercial or non-federal work, skim the current Companion before your next bid so your approach tracks the latest guidance.
What to Do This Week
Nothing here calls for a scramble. A short checklist keeps you in front of the change.
- Check that your SAM.gov user roles and points of contact are current. A notice about posted information only helps if the right person actually sees it.
- Read through your own R/Q record and Workspace, and flag anything wrong or stale.
- Capture the corrective action behind any past performance problem now, while the details are fresh, so it is ready to post as mitigating information.
- Build a subcontractor flow-down and monitoring check into your proposal and contract kickoff lists.
- Put your CPARS evaluation responses on a calendar, since CPARS still holds past performance reviews.
Key Takeaways
- Effective November 17, 2026, the government will create contractor integrity records in SAM.gov and stop creating them in CPARS.gov, per an official acquisition.gov notice. The change touches FAR Part 9 and subpart 42.11.
- An integrity record has a non-public Workspace and a public R/Q section. Workspace data moves to the public section after 14 calendar days, with limited exceptions.
- Before awarding above the simplified acquisition threshold, the contracting officer must review your R/Q records in SAM.gov. Past performance still comes from CPARS.gov.
- A lack of performance history alone cannot sink you, but a recent deficiency can, unless you show corrective action.
- Subcontractor issues can be posted to the prime’s record, and the prime can post mitigating factors that the officer will consider.
How CyberX Gov Solutions Can Help
A record that updates in real time rewards contractors who treat SAM.gov as a living file instead of an annual task. A second set of eyes makes that easier.
CyberX Gov Solutions helps businesses stay federal-ready through our Get Fed Ready™ program, which includes SAM.gov registration support and federal compliance guidance. When a bid is on the line, our proposal development team helps you shape a clear responsibility and past performance story, down to how you present corrective actions and subcontractor oversight.
We will not give legal advice on a specific determination. What we do is help you walk into your next proposal already knowing what your record says about you.
Conclusion
This is not a headline rule. It is the quiet paperwork that settles whether a contracting officer calls you responsible before an award.
The contractors who come out ahead will keep SAM.gov current, document their corrective actions, and manage their subcontractors with the same care they bring to their own work. The record is living now, so treat it that way.
Not sure what your SAM.gov record says about you? CyberX Gov Solutions can review your responsibility and past performance story before your next proposal. Schedule a readiness check at cyberxgovsolutions.com/schedule-a-meeting/.
Frequently Asked Questions
What is the difference between an integrity record and a past performance review?
An integrity record captures conduct and responsibility information a contracting officer uses before award, and it now lives in SAM.gov. A past performance review rates how you did on a specific contract, and it still lives in CPARS.gov. The two are related but separate.
Who can see my SAM.gov integrity record?
It depends on the segment. The SAM.gov Workspace is non-public and visible only to government personnel or to you when viewing your own data. The responsibility and qualification section is public, and Workspace data moves there after a 14-calendar-day waiting period unless an exception applies.
Can a new small business with no past performance be found nonresponsible?
Not for that reason alone. The FAR text says a contractor cannot be judged responsible or nonresponsible based solely on a lack of relevant performance history. A thin record is not an automatic disqualifier.
What should I do if incorrect information appears in my record?
Move quickly. If you believe posted information is covered by a FOIA exemption, assert that within 7 calendar days to the official who posted it, and they must remove it from the Workspace within 7 calendar days while it is reviewed. For other errors, raise them with your contracting officer and document your position.
Did my CPARS evaluations move to SAM.gov?
No. Only integrity records have moved so far. Past performance reviews stay in CPARS.gov, though the government has said other CPARS functions may transition later.
Is the FAR Companion Version 3.0 a rule I have to follow?
No. The FAR Companion is advisory guidance, not a binding requirement. It is a useful reference for current practice, including past performance and contract administration, but it does not carry the force of a regulation.